ISE 4192: P7 - Magna Welding

Abstract

We are working with Magna Seating Columbus to implement a Kanban system to eliminate type II Muda from their welding system.

Keywords:

Kanban, Material Flow, Scheduling, Inventory, JIT

Co-presenters

Joe Ash; Nicholas Shust

Status

Undergraduate

Department

Industrial and Systems Engineering

College

Russ College of Engineering and Technology

Campus

Athens

Faculty Mentor

Sormaz, Dusan

This document is currently not available here.

Share

COinS
 

ISE 4192: P7 - Magna Welding

We are working with Magna Seating Columbus to implement a Kanban system to eliminate type II Muda from their welding system.